Homeowner Checklist for Hardwood Floor Installation
We’re excited to install your new hardwood floors! To ensure a smooth, on-time project and the highest quality results, please complete the checklist below before your scheduled installation date.
If you have any questions at any time, call us at 608-849-7277.
🧹 Phase 1: Prepare Your Space
Please make sure the installation areas are fully ready before we arrive:
📦 Phase 2: Material Storage & Acclimation
Proper storage is critical for a successful installation.
🌡️ Phase 3: Environmental Conditions
Your home environment must be stable before and during installation:
🚪 Phase 4: Access & Scheduling
Help us stay efficient and on schedule:
🧩 Phase 5: Project Details & Preferences
Let’s finalize the details before we begin:
✅ Phase 6: After Installation
A few final steps after your floor is complete:
✔️ Final Confirmation
Please confirm that all applicable items will be completed before your installation date.
If anything cannot be completed on time, contact us as soon as possible at 608-849-7277 so we can adjust scheduling if needed.
Thank You
Thank you for choosing Schreffler Custom Wood Flooring. We look forward to transforming your home with a beautiful new hardwood floor.
Schreffler Custom Wood Flooring
815A S. Division St
Waunakee, WI 53597
📞 608-849-7277
We’re excited to install your new hardwood floors! To ensure a smooth, on-time project and the highest quality results, please complete the checklist below before your scheduled installation date.
If you have any questions at any time, call us at 608-849-7277.
🧹 Phase 1: Prepare Your Space
Please make sure the installation areas are fully ready before we arrive:
- Clear all furniture, rugs, décor, and personal belongings
- Remove existing flooring (if agreed upon), or confirm we are handling removal
- Ensure subfloor is clean, dry, and free of debris (dust, pet hair, etc.)
- Remove or secure wall hangings, curtains, and blinds
- Remove or adjust baseboards, trim, or molding (or confirm we will handle it)
- Prepare doors for trimming if needed (or confirm we will handle it)
- Inspect and verify subfloor is flat and structurally sound
📦 Phase 2: Material Storage & Acclimation
Proper storage is critical for a successful installation.
- Provide a dry, indoor storage area (spare room, living room, etc.)
- ❗ Do NOT use garages or basements (moisture risk)
- Maintain conditions:
- Temperature: 60–80°F
- Humidity: 35–55%
- Ensure space is accessible and clear
- Deliver materials
- Confirm proper acclimation before installation
🌡️ Phase 3: Environmental Conditions
Your home environment must be stable before and during installation:
- HVAC system must be running for at least 48 hours prior
- Maintain:
- Temperature: 60–80°F
- Humidity: 35–55%
- Ensure no moisture issues (leaks, spills, humidity)
- Keep windows and doors closed
- Provide adequate lighting in work areas
- Perform moisture testing if needed
🚪 Phase 4: Access & Scheduling
Help us stay efficient and on schedule:
- Ensure work areas are free during installation hours (e.g., 8 AM – 4 PM)
- Provide clear pathways for materials and equipment
- Arrange parking or driveway access
- Keep pets and children away from work areas
- Be available (or assign a contact person)
🧩 Phase 5: Project Details & Preferences
Let’s finalize the details before we begin:
- Provide or confirm supply of transitions, thresholds, or reducers
- Confirm layout preferences (plank direction, patterns) in writing
- Protect adjacent areas (or confirm we will handle protection)
- Install underlayment/moisture barriers as required
- Install flooring according to agreed specifications
✅ Phase 6: After Installation
A few final steps after your floor is complete:
- Confirm who will handle debris and old flooring disposal
- Avoid heavy furniture and foot traffic for 24–48 hours (as required)
- Schedule a final walkthrough with our team
- Review the completed project with you
- Provide care and maintenance instructions
✔️ Final Confirmation
Please confirm that all applicable items will be completed before your installation date.
If anything cannot be completed on time, contact us as soon as possible at 608-849-7277 so we can adjust scheduling if needed.
Thank You
Thank you for choosing Schreffler Custom Wood Flooring. We look forward to transforming your home with a beautiful new hardwood floor.
Schreffler Custom Wood Flooring
815A S. Division St
Waunakee, WI 53597
📞 608-849-7277